分类
雪城大学新闻

克鲁兹学院的三个冲天炉开始进行砌体修复

历史悠久的克劳斯学院(Crouse College)顶部的圆顶将于今年夏天拆除并修复。周三上午(5月23日),第一个被小心地从屋顶上拆下来,由一台大型起重机吊到地面,其他两个也将随之降下。它们将在现场重建,并于8月中旬重新安装。(艾略特·雷恩照片)

cupola surrounded by cables

cupola being lifted from roof

cupola in mid air

workers on the ground watching cupola being lowered

Empty rooftop space after the cupola has been removed

Workers inspect the cupola on the ground

,

新闻旨在传播有益信息,英文原版地址:https://news.syr.edu/blog/2019/05/23/masonry-restoration-begins-on-trio-of-crouse-college-cupolas/